top of page

Baja California (2023, Mexico)             

Baja California (2023, Mexico)             

Who?

Private Client partnership with ARCbuild.

​

What?

A 640 square foot, multi-story, single-family unit with off grid blackwater, water, and solar power.

​

Where?

Pre-built in the factory in Ensenada and shipped 1,000 miles south to an off grid remote site in La Ventana, Mexico.

​

When?

Q1 2023.

​

Why?

To test:

  • Pre-build and sub-factory site 

  • CAT 5 hurricane-resistant building materials

  • Speed and ease of assembling this unit using just unskilled labor with battery-powered tools in a remote location

bottom of page