ProxMAP™

Proximity Modular & Assembly Process

We put factories in high demand markets.

 

Our proprietary manufacturing and controlled logistics processes can be deployed virtually anywhere in under 3 months.

 

Shipping and logistics can add considerable cost to the price of a modular home, often as much as 35% of the overall price of the home. The longer it takes to transport – the more your costs go up. Our assembly and delivery strategy brings these costs down dramatically.

ARCbuild Solution
  • Position factories in high-demand markets (100 homes/year minimum)

  • Dramatically reduce the distance between where we manufacture and the assembly site

  • Reduce time to delivery by weeks

Removing this section? Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce sed posuere dui. 

Nullam tortor dui, sodales blandit augue dapibus, pretium condimentum tortor. Nunc finibus accumsan cursus. Aenean viverra risus purus, ut hendrerit mi ornare vitae.

Feature 1

Nullam tortor dui, sodales blandit augue dapibus, pretium condimentum tortor. Nunc finibus accumsan cursus.

Feature 2

Nullam tortor dui, sodales blandit augue dapibus, pretium condimentum tortor. Nunc finibus accumsan cursus.

Feature 3

Nullam tortor dui, sodales blandit augue dapibus, pretium condimentum tortor. Nunc finibus accumsan cursus.

Feature 4

Nullam tortor dui, sodales blandit augue dapibus, pretium condimentum tortor. Nunc finibus accumsan cursus.

Feature 5

Nullam tortor dui, sodales blandit augue dapibus, pretium condimentum tortor. Nunc finibus accumsan cursus.

Feature 6

Nullam tortor dui, sodales blandit augue dapibus, pretium condimentum tortor. Nunc finibus accumsan cursus.

THE PROCESS

ARCbuild homes can be manufactured, delivered and assembled in under 12 weeks.

Contact Us to Learn More

Your time is valuable, so we won’t waste it with marketing hype. We speak your language. Get in touch and an expert will get back to you promptly.

State

Frequently
Asked
Questions

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Design and architecture

2-4 Weeks

  • Review/Create Floor Plans and Elevations

  • Design Submission

Catalogue  15.png

Manufacturing

6-8 Weeks

  • Prefabricated units are built following rigorous quality controls

  • Internal proprietary processes and software ensure consistency across products and locations 

  • Up to 80% of manufacturing and inspections performed in the factory

Screenshot 2025-05-05 at 13.45.42.png

Shipping

1-2 weeks

  • Units undergo final inspection to ensure they meet standards and tolerances

  • Finished units are shipped via land

  • ARCbuild partners with experienced logistics companies to deliver seamless, cost effective, and flexible delivery options

shipping.avif

Installation & Assembly

2-4 weeks (dependent on size and finish)

  • Modules delivered and staged on site

  • Installation by our team or yours

  • We manage final on-site inspections